Abstract
Well Jepon-1 (JPN-1) at Gundih Field, Indonesia, a former exploration gas well, was selected as a candidate to be converted to a CO2 injector well. The study discussed the integrity evaluation of Well JPN-1, focusing on: 1) the corrosion analysis and the tubing material selection, 2) the evaluation of leakage in the well, 3) the evaluation of the cement sheath behind existing casing and liner, 4) the evaluation of remedial cementing, and 5) the future plan of re-completion design.Based on a thorough evaluation of the latest condition of the well, including the workover and logging operations, the integrity of the well could be improved after the remedial cementing operations. However, the conversion of the Well JPN-1 to a CO2 injector well cannot be performed yet due to gas leakage problem and casing integrity issues. A further operation to improve well integrity should be carried to fulfill the requirement according to NORSOK D-010 standard.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.