Abstract

The increasing tempo of power generation in India has resulted in the starting of basic industry for the manufacture of power house equipment. The Heavy Electrical unit at Bhopal and the Bharat Heavy Electricals' units at Hardwar, Hyderabad and Tiruchy will together meet the requirements of large power houses. The Tiruchy Unit, in particular, has an annual manufacturing capacity of 0.8 million KW power generation equipment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.