Abstract
Abstract Remaining Useful Life (RUL) estimation has been extensively explored in recent years. RUL could be used in deciding the maintenance timeline or inspection interval for the Reaktor Serba Guna – G. A. Siwabessy (RSG-GAS reactor). RSG-GAS reactor is a pool-type research reactor (built by the Interatom Internationale of Germany) and has been operating for more than 30 years to date. This study aimed to propose a Weibull model to find the RUL estimation value of the distribution parameters of the mean time to failure (MTTF). Therefore, the RSG-GAS reactor would be higher safety, longer lifetime and higher reliability with a smaller failure rate including for the PA01-AP01 secondary pump. The research methodology is processing data collection and estimating the parameters of the Weibull model to determine maintenance timeline or inspection intervals based on the MTTF value in case the reliability has reached the targeted percentage. Results show that the RUL estimation has been obtained for the RSG-GAS reactor. In the implemented study, a maintenance timeline has been stipulated for the PA01-AP01 secondary pump (with the model of KSB and type of CPK-S350-400) for the reliability of 90% and RUL estimation of circa 29 days.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.