Abstract
Research has demonstrated that four-dimensional computer aided design (4D CAD), in which a three-dimensional (3D) CAD model is animated through time, is useful in helping professionals understand the construction schedule. However, cumbersome processes to update a 4D CAD model, which involve changing geometry representations, changing schedules and bar charts, linking the geometry to the scheduling information, and generating animations, may discourage professionals from using 4D CAD in actual construction projects. A software prototype implementing 4D CAD in a Web environment overcomes limitations of current 4D CAD tools. This software permits editing of the construction schedule over the Internet and shows the revised construction sequence visually on a Web browser using 3D computer graphics. This software is composed of a database on a server, Active Server Pages (ASP) scripts, and a Java applet that was developed using Java 3D Application Programming Interface (API) and Java JDBC. The Java applet retrieves the 4D model at the appropriate level of completion over the Internet and allows users to navigate around the model on the Web browser. Web4D visualization software can help professionals to expedite the schedule updating process by involving designers and constructors in collaborative decision- making.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.