Abstract

Weaving enterprises are faced with problems of small batches and many varieties, which leads to difficulties in manual scheduling during the production process, resulting in more delays in delivery. Therefore, an automatic scheduling method for the weaving process is proposed in this paper. Firstly, a weaving production scheduling model is established based on the conditions and requirements during actual production. By introducing flexible model constraints, the applicability of the model has been greatly expanded. Then, an improved ant colony algorithm is proposed to solve the model. To address the problem of the traditional ant colony algorithm that the optimizing process usually traps into local optimum, the proposed algorithm adopts an iterative threshold and the maximum and minimum ant colony system. In addition, the initial path pheromone distribution is formed according to the urgency of the order to balance each objective. Finally, the simulation experiments confirm that the proposed method achieves superior performance compared with manual scheduling and other automatic methods. The proposed method shows a certain guiding significance for weaving scheduling in practice.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.