Abstract
Adverse weather delays forty-five percent of construction projects worldwide, costing project owners and contractors billions of dollars in additional expenses and lost revenue each year. Additionally, changes in climate are expected to increase the frequency and intensity of weather conditions that cause these construction delays. Researchers have investigated the effect of weather on several aspects of construction. Still, no previous study comprehensively (1) identifies and quantifies the risks weather imposes on construction projects, (2) categorizes modeling and simulation approaches developed, and (3) summarizes mitigation strategies and adaptation techniques to provide best management practices for the construction industry. This paper accomplishes these goals through a systematic state-of-the-art review of 3207 articles published between 1972 and October 2020. This review identified extreme temperatures, precipitation, and high winds as the most impactful weather conditions on construction. Despite the prevalence of climate-focused delay studies, existing research fails to account for future climate in the modeling and identification of delay mitigation strategies. Accordingly, planners and project managers can use this research to identify weather-vulnerable activities, account for changing climate in projects, and build administrative or organizational capacity to assist in mitigating weather delays in construction. The cumulative contribution of this review will enable sustainable construction scheduling that is robust to a changing climate.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.