Abstract
4D simulation became a basic function in the construction project which adopt BIM technologies. Although, It could do very important role when project planning and execution, the projects which use this function are very few. They implements 4D simulation with a general 3D graphic software such as 3D studio max or with manual labor in most of the construction projects. 4D simulation requires relationship between 3D objects and construction activities. Manual linking operation among them is very hard to work and it cause many problems. In this paper, we suggested the WBS generator system to organize WBS for automated relationship between them and analyzed efficiency when 3D Model and activity automated relationship method is applied. Efficiency test with the suggested method when implementing 4D simulation was also implemented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Architectural Institute of Korea Structure & Construction
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.