Abstract

The $3,300,000,000 appropriated by the Federal Government has been mostly apportioned, but as yet the results in actual construction are not evident. The Gods grind slowly, and they have nothing on Government procedure and caution. However, the delay is probably the result of the gigantic size and intricacy of the mechanism and no doubt it is desirous that the loans granted be conservative and safe. The Public Works Administration Board in Indiana has had