Abstract

The rate of population growth in Titab and Telaga Village, Busungbiu District, Buleleng Regency in 2007-2010 reaches 0.75%, which affects the level of water demand needed for daily needs. One of the efforts to meet the needs of raw water for drinking water, among others, by the development of a potable water supply system infrastructure. Based on the facts, it is necessary to design Water Supply System (SPAM) in Titab and Telaga Village with Titab Reservoir spring with 350 l/dt of debit which is expected to give standard of quantity, quality, continuity of service for Titab and Telaga Village which is 5 km from the dam. In order to maximize the service to the community in Titab and Telaga Village, it is necessary to know the use of drinking water for each household. The next analysis is the calculation of projected drinking water needs over the next 20 years. Planning and calculation of water distribution using WaterCad i8 Software. From the result of projection analysis, the drinking water requirement in Titab and Telaga Village based on the fact of household drinking water usage in 2037 is 5,568 lt/sec. While the effort to maximize water supply network services is by projecting drinking water needs in Titab and Telaga Village based on the fact of household drinking water usage. With the help of WaterNet Software, it will simplify the distribution network planning of drinking water in order to produce integrated drinking water network system to meet the needs of clean water in Titab and Telaga Village.

Highlights

  • Titab and Telaga Village are administrative areas located in Busungbiu district, Buleleng Regency in which the area of both villages reaches 819,355 Ha

  • The flow in the pipeline of the water transmission network in potable water supply system is the flow in the pipe or pressurized flow in which the flow where the entire cross section https://doi.org/10.10 51/matecconf /201927606029 of the pipe is filled with water

  • The village has not been served by PDAM Buleleng, and the drinking water supply system in the area is managed by the village

Read more

Summary

Introduction

Titab and Telaga Village are administrative areas located in Busungbiu district, Buleleng Regency in which the area of both villages reaches 819,355 Ha. The field survey result found that the utilization of raw water resources for the fulfillment of clean water in Titab and Telaga Village was managed by the villager who came from four spring sources including Tinggih spring, Batu Prigi, Pangkung Biu and Hutan Telaga with a distance of ± 5 km from both villages The condition of these four springs is quite clean but clogged up, it can be seen from the small discharge. The infrastructure development of the potable water supply system is one of the efforts to improve the service of water distribution systems to serve the needs of clean water for society in Titab and Telaga village. It is necessary to design Water Supply System (SPAM) in Titab and Telaga Village, Busungbiu District, Buleleng Regency with a spring source of Titab Reservoir with an effective storage volume of 10.08 million m3

Design of water supply system
Clean water needs
Hydraulics analysis on piping
Pressure loss in pipes
Use of the water net application
Physical conditions of Titab village
Physical condition of Telaga village
Potable water supply system in Buleleng regency
Clean water service system in Titab and Telaga Village
Regional service plan
Projected population
Water treatment plant
Result
Conclusions
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call