Abstract

The current water shortage in Egypt is 13.5 Billion cubic meter per year (BCM/yr) and is expected to continuously increase. Currently, this water shortage is compensated by drainage reuse which consequently deteriorates the water quality. Therefore, this research was commenced with the objective of assessing different scenarios for 2025 using the Water Evaluation and Planning (WEAP) model and by implementing different water sufficiency measures. Field data were assembled and analyzed, and different planning alternatives were proposed and tested in order to design three future scenarios. The findings indicated that water shortage in 2025 would be 26 BCM/yr in case of continuation of current policies. Planning alternatives were proposed to the irrigation canals, land irrigation timing, aquatic weeds in waterways and sugarcane areas in old agricultural lands. Other measures were suggested to pumping rates of deep groundwater, sprinkler and drip irrigation systems in new agricultural lands. Further measures were also suggested to automatic daily surveying for distribution leak and managing the pressure effectively in the domestic and industrial water distribution systems. Finally, extra measures for water supply were proposed including raising the permitted withdrawal limit from deep groundwater and the Nubian aquifer and developing the desalination resource. The proposed planning alternatives would completely eliminate the water shortage in 2025.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call