Abstract

Tunnel excavation breaks the original hydrological dynamic balance, promotes water cycle and influences the mountain groundwater system to some extent. Water inflow during construction not only threatens construction safety, but also affects surface vegetation’s growth. Taking tunnel 1 in Chongqing Cimushan area as the project background, and through analyzing the hydrological test results from tunnel exploration stage, counting the actual water inflow quantity in construction period, doing the 3-D finite element numerical modeling, we analyzed and evaluated the tunnel water inflow quantity, to provide reference for recognizing the harm of groundwater and making treatment measures.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.