Abstract

Abstract Elephants are widely recognized as ecosystem engineers. To date, most research on ecosystem engineering by elephants has focused on Loxodonta africana and Loxodonta cyclotis, and the role of Elephas maximus is much less well-known. We here report observations of anuran eggs and larva in water-filled tracks (n=20) of E. maximus in Myanmar. Our observations suggest that water-filled tracks persist for >1 year and function as small lentic waterbodies that provide temporary, predator-free breeding habitat for anurans during the dry season when alternate sites are unavailable. Trackways could also function as “stepping stones” that connect anuran populations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.