Abstract

This paper made an effort for the implementation of proportional (P)-integral (I)-double derivative (DD) (PIDD) controller rendered with water cycle algorithm (WCA) to maintain stability of multi-area diverse source (MADS) interconnected power system. MADS system comprises of two areas with generation units like thermal-hydro-gas in each area. WCA tuned PIDD controller performance is assessed by injecting a step load disturbance of 1% in area-1 of MADS system and the PIDD controller efficacy is showcased by comparing with the performances of classical PI and PID controllers. To perform the research work more close to realistic practice, communication time delays (CTDs) are perceived with the system. Moreover, the importance of considering CTDs in the process of designing secondary regulator is demonstrated.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.