Abstract
Analysis and evaluation of project documentation of construction of wastewater treatment facilities of industrial enterprises showed that the purification of industrial wastewater and surface waste water must be carried out at different treatment plants with different cleaning lines. The paper also reveals that the calculation determining the weighted average concentrations of pollutants in surface sewage is carried out incorrectly. The author proposes an improved method for determining the initial concentration of pollutants in surface wastewater.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have