Abstract

This paper discusses the design and construction of a 10·5 km long, segmentally lined, flow transfer tunnel. It covers the detailed lining and shaft designs, selection criteria for the tunnelling machines, shaft and tunnel construction methods, and specialist ground treatment. The paper discusses several construction problems encountered with shaft sinking and tunnelling, and describes how these were resolved. Particular note is made of caisson sinking of shafts and the design of the tunnel entry and exit portal eyes. Jet grouting in the varying ground strata around these portals and on other areas of the contract is considered.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.