Abstract

Recently, there has been a recognized need to use waste lime landfills for land reclamation projects. Waste lime earthwork is more challenging than general earthwork operations due to potential health and safety hazards and significant changes in earthwork volume. There has been substantial research undertaken on the role of advanced construction technologies in general earthwork; however, their potential in hazardous waste lime environments for earthwork management is yet to be explored. This research proposes a methodology that integrates drone and BIM construction technology for effective and efficient hazardous waste lime earthwork management for construction projects. Drones are used for surveying, providing as-built information, and BIM to model, process, and evaluate the progress of waste lime earthwork. Volume change analyses are conducted using BIM to calculate dehydration time due to the ripple effect of waste lime for cost-efficient earthwork haulage. The case study provides evidence that the proposed method using advanced construction technologies improves productivity, safety, cost control, and better project management for earthwork related to hazardous waste materials.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.