Abstract

Based on References, the paper studies a more commonly used system in project, that is, under the condition of unreliable switch, we study the warm standby repairable system which consists of two components with priority and a repair facility. A repairable model of this system is set up where both the lifetime and repaired time of the components and the switch obey the general time-distribution and the system fails immediately when the switch fails. Finally, several reliability indices of this model are obtained. Key words: Priority, Warm Standby Repairable System, Markov Renewal Process

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.