Abstract
AbstractWest Link (Swedish: Västlänken) is one of the biggest infrastructure projects in Sweden building an in total 8 km double‐track railway tunnel in Gothenburg, which is currently under construction. “E05 Korsvägen” is a construction lot which is part of the West Link project with the Swedish transport authority Trafikverket as the client. The works were awarded to the Joint Venture (JV) West Link Contractors consisting of Wayss & Freytag Ingenieurbau AG and NCC. A special contract model with a design and build part combined with a regular bill of quantities comprises building an underground double‐track railway tunnel with a length of 3.2 km and the new Korsvägen station. This sub‐project includes three drill and blast sections and three open excavation sections. All three construction pits will be executed in challenging soft ground conditions. The JV is confronted with high environmental demands and special requirements for the blasting works in the urban area of Gothenburg.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.