Abstract

SylWin1 is a VSC HVDC link connecting 864 MW offshore wind power generation to Germany's high voltage network. This paper presents a harmonic performance analysis of the offshore network carried out during the design and commissioning phase with a focus on the distortions at the 155 kV and 33 kV offshore networks caused by the amplification of harmonics generated by the HVDC and wind turbine converters. Low frequency harmonic amplification problems are mitigated by introducing active damping in the HVDC converter controls in order to achieve a cost effective solution with the aim of reducing offshore harmonic current and voltage distortions. The analysis was carried out with the help of detailed frequency domain model offline simulations of the offshore network and on-site measurements.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.