Abstract

There are many classification methods for temporary plugging volume fracturing. According to different temporary plugging positions and temporary plugging targets, temporary plugging volume fracturing technology can be divided into temporary plugging in fractures and temporary plugging between fractures. According to the number of temporary plugging, it can be divided into one temporary plugging and multi-level temporary plugging. According to the action mode of temporary plugging, it can be divided into physical temporary plugging and chemical temporary plugging. According to the type of temporary plugging agent, it can be divided into plugging balls (plastic balls, rubber balls, nylon balls, wax balls) temporary plugging, fiber temporary plugging, large particle size proppant temporary plugging, etc. In Changqing, Daqing and Xinjiang oilfields in China, temporary plugging agents have been reported to be used for in-fracture diversion fracturing to improve reservoir productivity, and certain effects have been achieved. Compared with conventional staged fracturing, the temporary plugging of the seam to fracturing technology has the following advantages: conventional staged fracturing is difficult to implement, the temporary plugging of the seam to fracturing technology can be used to realize effective layering (segment) reconstruction, general fracturing reconstruction is insufficient, and temporary plugging of the seam to fracturing can be used to improve thereconstruction effect.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call