Abstract

In this paper the optimal solutions of the following two decoupled problems are given on the basis of the model presented in Part I:(i) The capacitor (var) problem: determination of the locations, sizes and the real-time control of n ON/OFF switched and fixed shunt capacitors, (ii) The regulator (volt) problem: determination of the locations and real-time control of minimum number of voltage regulators. The objective in both problems is to minimize the peak power and the energy losses and to provide smooth voltage profile along the distribution system with lateral branches. For the first time, the nonlinear costs of installation of the capacitors are incorporated into the capacitor problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.