Abstract

In this paper, voltage stability constrained maximum loadability of power system is analyzed. Whenever load on the system is increased, then bus voltage will decrease due to insufficient reactive power. But for proper operation of electrical equipment, voltage must be maintained within the permissible voltage limit. This is achieved by including FACTS device in weak bus. The main objective of the paper is to keep the bus voltages within the acceptable limit, when it subjected to load change and find the suitable location of FACTS with the maximum loadability condition. The IEEE 14-bus test system is used for analysis.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.