Abstract

When a monolithic construction is being erected, a strict regime must be followed on the thickness of a concrete layer and on the layer's solidification time. This regime can only be satisfied if all the cooperating ele ments (a concrete mixer, a crane, gangs working at the top of a building) harmonize. Assuming constant parameters of the co operating elements (but no constant increase of the construction within a 24-hour period is required), this paper presents the CoMB program, which dynamically visualizes this harmonization and reports the percentage of usage of co-operating elements. A didactic aspect of such a visualisation is outlined.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.