Abstract
This paperexamines procedures and findings in estimation of the ‘visual disamenity cost’ associated with installation of high-voltage overhead power lines in the Wet Tropics of Queensland 1 . The study was performed within a short timeframe and small budget, hence the need to design a relatively simple and cost-effective approach, yet one which would yield acceptable information on environmental values. An extensive literature review and advice from a number of resource economists indicated that there was little information from previous studies to support benefit transfer methodology. It was found possible to estimate disamenity costs to ecotourism operation (using a simplified travel cost approach), agricultural operations (based on compensation payments) and residential property values (through a simplified hedonic price approach). A planned contingent valuation of the intrusive effect of the transmission lines through rainforest areas did not proceed, due at least in part to the political sensitivity of this issue.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.