Abstract

The visualizing technology of project management is the most effective method for improving highway construction management and monitoring. In this paper, based on the analysis of the highway construction engineering project management needs such as comprehensive visualization, visual progress management, visual measurement management, visual safety management, visual monitoring requirements, etc. and combining the operational requirements of highway construction project management, the visual project management system is established using the three-dimensional virtual and information technology, including project management platform and visualization display platform, in order to achieve visible and controllable project construction and management process. The visualization project management system has been preliminarily applied to the process of expressway reconstruction project. The example analysis showed that the visualization project management system can be a better way for the expressway reconstruction project management services, which can effectively improve the level of construction projects.Keywords: Highway construction;Visible project management system;Three-dimensional (3D) virtual Reality;Information technology

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call