Abstract

With the rapid development of underground space utilization, the excavation of new tunnels with ultra-shallow under crossing buildings using the drilling and blasting method is gradually increasing. The blasting vibration will undoubtedly affect the surrounding buildings. Reducing the impact of blasting vibration on ground buildings has become an important technical challenge faced by tunnel blasting technicians. The inlet end of the Xi'an-Chengdu High-Speed Railway Xiannvyan Tunnel passes below a village through an ultra-shallow buried section; as a result, blasting vibration control is a major concern. A design scheme for a 0.6 m footage in tunnel was proposed and verified through field tests. A 0.8 m footage scheme and 1.8 m footage millisecond interference vibration reduction scheme were proposed, respectively. Based on the HHT analysis, by comparing the surface vibration velocities and instantaneous energy obtained from the millisecond delay detonation of cutting holes and the detonation of different charging schemes, we found that the free surface, mass of single dynamite charges, and tunnel burial depth had significant influences on the surface vibration.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call