Abstract

One of the impact blasting activity is Ground Vibration which will affect the stability of the slope. Research and experiment conducted using Signature Hole Analysis (SHA) for monitoring wave propagation in each block-strip used to model and predict vibration which caused by the blasting activity. Signature Hole Analysis combined with Scaled Distance has succeeded in becoming the solution of ground vibration management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.