Abstract

Pakistan Research Reactor-1 (PARR-1) has been converted to low enriched uranium (LEU) fuel and upgraded to a maximum power level of 9MW. During conversion and upgradation most of the reactor systems were modified and several additional facilities were provided. Major changes were carried out in the cooling system. These include installation of new primary pumps, set of heat exchanger assemblies, a cooling tower and piping system. Vibration tests on these systems were performed to check the integrity and detect any abnormality in normal operation. Results of the tests performed on the primary pumps and core support structure comply with the requirements for pre-operational and initial startup vibration testing of nuclear power plant (NPP) system. Attempt is now being made to analyze vibrations of primary piping. The Primary Water Inlet Pipeline (PW-IPL) is of stainless steel conveying demineralized water from holdup tank to the reactor pool. The section of the pipeline from heat exchangers to the valve pit...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.