Abstract

Based on the vertical loading test results of large-diameter filling pile near an electric factory in the sandstone and mudstone foundation, the load transfer mechanism and vertical loading bearing behavior of the pile were discussed. The analysis shows that the pile mainly behaves as friction piles and the vertical bearing capacity is mainly supplied by side friction resistance. The pile side friction is related to the section displacement of pile, the pile load and the soil characteristic. The pile end resistence is related to pile end settlement, pile diameter, rock-socketed length,rock elasticity modulus of pile end, sediment thickness and pile construction technical. The pile end resistence linearly increases with the settlement of pile end. In tis paper, the dead-load test is recommended in determination the pile bearing capacity and the sediment thickness should be strictly controlled in order to meet the standard. In the intermediary weathered sand-mudstone, the pile end should inset two times of pile diameter for pile whose diameter is 800mm. The pile end should inset 2 meters for pile whose diameter is 1500mm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.