Abstract

The stabilization pond system in Grand Cayman consists of two facultative ponds in parallel followed by two maturation ponds in series, operating over a limited mean annual temperature variation of 4.5°C and with a mean total retention time of 21.2 days. The results of the operation of these ponds over a 12-month period were analysed to verify the value of the first-order, complete-mix approach to design. Some appreciable support for the use of this approach was elucidated for the design of faculative ponds, particularly for the removal of faecal coliforms. First-order reaction coefficients of 0.357 d −1 at 30°C for BOD 5 removal (filtered effluent samples) and of 15.7 d −1 for faecal coliform removal were established for facultative ponds. Some attention was also given to various design approaches relating areal loading to temperature but with the limited temperature range available few conclusions could be drawn.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.