Abstract

AbstractToday’s workflow management systems have not sufficiently dealt with time information, which involves time modeling at build-time and time management at run-time. As a consequence, workflow management systems are short of the ability to support the checking of temporal constraints at run-time. Although several approaches have been devised to tackle this problem, they are limited to a single workflow, using static techniques to verify temporal constraints on it. However, in an environment with concurrent workflows, there may well exist resource constraints between these workflows, which affect significantly the verification of temporal constraints at run-time. In this paper, we propose a novel approach for dynamic verification of temporal constraints for concurrent workflows. We investigate resource constraints in workflow management systems and concurrent workflow executions, and then develop the proposed verification method through analysing the temporal relationship and resource constraints between activities from different workflows.KeywordsTemporal ConstraintResource DependencyActive IntervalResource ConflictDynamic CheckThese keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.