Abstract

The deep seafloor observatory for the VENUS project will be a first complex observatory which uses retired coaxial submarine cable. Installation of the observatory requires three procedures; cable amputation, cable recovery, and re-installation. For the VENUS project, the cable reinstalling operation requires precise cable position control to put the observatory to target area. To solve the problem, Japan Marine Science and Technology Center (JAMSTEC) developed a cable recovery system consisting of a cable cutter, cable grippers and a pump unit. The pump unit which is electrically powered from underwater vehicle, generates hydraulic pressure to actuate the cable cutter and cable gripper. This system has an ability to amputate the cable at the deep seafloor and pick out to the surface. Cable recovery system was designed and manufactured to fit for underwater vehicles in JAMSTEC and has a capability to actuate in full ocean depth. Performances of the components are confirmed by pressure tests, amputation tests, gripping tests and strain tests on land or in pressure test tank. To ensure the total system performance, sea trials will be conducted by manned submersible at 6500 m depth seafloor.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.