Abstract

When two lines with 20 same high-speed passenger vehicles are traveling on the 40 m+4×72 m+40 m party pre-stressed concrete continuous box-girder bridge from both ends, this bridge vertical load-carrying frequency is calculated with the vehicle-bridge system mode1. When the vehicle parameters, such as the unsprung mass of each wheel-set of the vehicle, the suspension spring stiffness, the vehicle length and the mass of the vehicle, are changed, the bridge vertical load-carrying frequencies are changed too. But when the train speed is changed, the bridge vertical load-carrying frequencies aren’t changed. It is shown that the bridge vertical load-carrying frequency is the vehicle-bridge system natural frequency, it is only depend on its natural parameters.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.