Abstract

Design value engineering (VE) has been performed in many construction projects according to the changes in the construction for most of the VB function analysis that performed, are problems that focus on function analysis and generating ideas based on individual experience of VE team member than generating ideas and value improvement of systematic function analysis. This may be due to the quotation of previously performed function analysis data, general function analysis, and abstract function definitions that do not cite the concrete characteristics of each facility. Therefore, in this study, the proposed cases from the existing design VE workshops, the current conditions of the connection between functions and ideas and of the idea categorization by building part were studied to determine why functions and ideas are not connected, and to propose pertinent improvement directions. on a performance-based function categorization system by building part that can provide the logical connection between functions and ideas in the function definition/categorization and function arrangement phases in the function analysis phase, the most important phase in VE activities, was developed by reflecting the required performance and functions for each part of the facility.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.