Abstract
AbstractThe completion-time variance (CTV) and the waiting-time variance (WTV) are two performance measures which are commonly used in optimization of single-machine scheduling systems. This paper shows that when the number of jobs is large the two measures are nearly equivalent in a probabilistic environment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have