Abstract

The article focuses on the issues of Load Frequency Control (LFC) under non-linear strategies in multi source multi area hydro thermal system. On practical perspective dead band, boiler dynamics, reheat steam turbine along with hydro turbine operating under two different area capacities are considered in the system. When subjected to random load variations in both the areas, the system exhibits higher oscillations. The speed governor matches the generation with the demand. The offset in the area frequencies and tie-line power is removed by using secondary Proportional Integral (PI) controller. The PI controller is tuned using Ziegler Nichols' (ZN) and Fuzzy Gain Scheduling (FGS) method. The influence of high Proportional (P) controller gain during steady state and high Integral (I) controller gain during transient affects the system performance. Variable Structure System (VSS) helps to switch from P to PI controller during transient to steady state based on control error. The concept of VSS is applied to Fuzzy Gain Scheduling (FGS) PI controller. The performance of the optimal Variable Structure Fuzzy Gain Scheduled (VSFGS) controller under non-linear environment is judged and validated using performance indices.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.