Abstract

In contrast to traditional methods which impose capacity costs on peak customers only, it is shown that, depending upon the design criterion employed in planning for the capacity expansion of the power system, off-peak marginal cost prices should also be imputed with some marginal capacity costs. Taking the loss of load probability (LOLP) design criterion as an example, we establish this conclusion formally, and suggest an algorithm to apportion accurately marginal capacity costs to various periods. The algorithm is then extended for power systems planned to meet a given loss of energy probability (LEOP) design target. Provisions to incorporate random deviations of customer's demand and maintenance requirements in the calculation process are also suggested.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.