Abstract

In a pilot-plant trickle-bed hydrotreating reactor, ideal operating regimes (plug flow, full catalyst wetting, and absence of reactor wall effects) are desirable to generate reliable, reproducible, and representative data for kinetics studies and commercial scale-up. In this study, the operating regimes of a heavy gas oil pilot-plant hydrotreating reactor were investigated under operating conditions of commercial interest using real petroleum feedstocks. Vapor–liquid equilibrium experiments and calculations were performed to accurately predict the fluid flows and the physical/transport properties of the vapor and liquid phases. These properties were subsequently used to predict the operating regimes under various operating conditions and to generate a map of operating conditions within which the desired operating regimes can be maintained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.