Abstract
Controlling the cost and time of project implementation is important in a project management process. In this research, a value engineering analysis will be carried out on the Ampelsari Reservoir construction plan to determine the most effective and cost-efficient alternative construction design. The application of value engineering to determine the amount of construction cost savings with a work plan includes: Information Stage, Creative Stage, Analysis Stage, and Recommendation Stage. The results of the value engineering analysis in this study obtained construction cost savings of Rp. 1,624,162,703.65 or 6.16% of the total initial design cost, with alternative designs selected in 3 (three) types of work, on Spillway Work with K-225 Reinforced Concrete and Cyclop Concrete work items (A3), on Gate Valve House Work with Concrete Rebate and U-Ditch 30 x 30 work items (B3), on Reservoir Work with HDPE Pipe work items dia. 2.5" (C2). 2.5" (C2)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Devotion : Journal of Research and Community Service
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.