Abstract

The article deals with the description of the methodology for determining the prices of construction work used most often in the reconstruction of historic buildings. The procedure is based on parametric estimating of buildings and on traditional tools and principles of pricing. The historic building is divided into structural parts and technological units. Structural elements are individually valued at the unit price, which was created on the basis of sub-budget. Very strict rules are set for the financing of cultural monuments and the method of valuation is based on the price systems’ methodology. The research also included an analysis of market prices and a subsequent comparison with indicative prices. Proper estimate of historic buildings’ reconstruction cost is also an important input for the decision-making process regarding the actual implementation of the project, its method of execution and its life cycle cost determination.

Highlights

  • Preservation of cultural monuments is one of the important ways to get to know our past

  • The valuation proposal itself is based on an analysis of market prices for construction work used in historic buildings in combination with traditional tools and pricing methods for the regular ones

  • In comparison with the indicative prices of the CS ÚRS price system in the price level I / 2021, the bid price was lower than the indicative price for 85% of the examined items

Read more

Summary

Introduction

Preservation of cultural monuments is one of the important ways to get to know our past. It is necessary to pay considerable attention to the economic aspect of this care, in terms of valuation. The uniqueness of every such cultural monument and the emphasis on the delicate way of intervention make it difficult to value such buildings. Each cultural monument requires a different degree of intervention, and each element that appears in the monument should be treated as unique. The biggest problem in both cases is the high specificity and uniqueness of the objects.

Objectives
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.