Abstract

This paper addresses issues that arise in evaluating, making, and using stochastic forecasts of future fertility in the United States. We begin with Lee's ARMA model which leads to prediction intervals that are more realistic and informative than point-wise forecasts or traditional scenario methods. The roles of historical information and expert judgment are analyzed in terms of their effects upon prediction uncertainty. Validation experiments suggest that the model performs well in characterizing the uncertainty of the US fertility experience. We argue that the long-run average of fertility, a key assumption of the model, operates on a time scale not probed by time-series methods and we use Bayesian priors to quantify the additional prediction uncertainty that comes from making the long-run fertility assumption.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.