Abstract

In the framework of the Broader Approach Agreement for the construction of the JT-60SA tokamak, ENEA provides 9 of the 18 toroidal field (TF) coils of the JT-60SA magnet system. The 9 coils are being manufactured by ASG superconductors in Genoa under the supervision of ENEA in collaboration with the JT-60SA European home team. The manufacturing is composed of two main steps: one concerning winding pack assembly and impregnation, and the other devoted to the integration into the casing structure and associated final coil preparation. This paper describes the results of the validation activities set-up for the integration phase. Specifically, welding of casing components has been retained particularly critical for at least three reasons: (i) during welding the WP may be damaged by the intense heating; (ii) distortion caused by heating may determine incorrect coil geometry and then field errors; and (iii) flaws may reduce structural strength and then the overall lifetime of the machine. Similarly, final embedding has been demonstrated on a 1m long mock-up of the coil. Main results and lessons learned are here described.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.