Abstract

Continuously utilities have to assess the possibility of connecting new, radial loads to their networks. One important consideration here is selection of the voltage at which these supplies will be constructed. The amount of power transmitted over a transmission line is a direct function of system voltage, and the correct selection of voltage is critical to ensure that the number of lines to be commissioned is optimized. The number of lines and by extension the voltage selected at which to construct them, influences the number of servitudes required. The acquisition of servitudes is usually a legislated process that requires public participation, amongst other things. It is becoming a challenge because of challenges from public, lack of space to build lines in future, cost of acquisition, lead times to obtain authorization, etc. The line voltage also influences the infrastructure costs. It is therefore important to construct assets that will not only be the least to meet the requirements, but also that will be best utilized. This paper presents the results on the work done to demonstrate the effectiveness of loadability curves in deciding on the appropriate voltage for building lines to supply new loads.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.