Abstract

The Natomas Mutual Water Company’s (NMWC) Sankey Diversion Project included a 434 cfs fish screen and pump station (Diversion) to divert water from the Sacramento River into an above grade irrigation canal on the landside of the Sacramento River levee. The pump station’s five 48-inch-diameter welded steel discharge pipes are routed over the top of the river’s flood protection levee at an elevation substantially higher than the canal water surface (discharge point). A complementary vacuum system was installed to reduce the pressure in the pipeline at the top of the levee and thereby reduce the total dynamic head and power consumption for the pump station. Early testing shows a 48 percent reduction in power use due to the vacuum system – a considerable savings since at least one 400 HP pump (and often three) runs 24-7 for months at a time. This paper presents the design concepts and components of a vacuum system with emphasis on vacuum piping requirements and mechanical systems integration. Design, installation, and startup of the vacuum system and associated piping at the Sankey Diversion Project will be reviewed, including operational control strategies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.