Abstract
A high-intensity proton injector (IPHI) prototype is operating at CEA-Saclay. It will provide eventually a 1 MW proton beam with a reliability of 95%. This paper describes the different parts of the project as well as the technological options in relation with the vacuum pumping system to reach the required pressure of 2×10 −5 Pa.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.