Abstract

The Princeton Large Torus (PLT) will be completed in 1975 and two other CTR-oriented toroidal plasma devices, the Poloidal Divertor Experiment (PDX) and the Tokamak Fusion Test Reactor (TFTR), are planned to be completed in 1977 and 1981. The vacuum systems of these machines must satisfy stringent requirements because of unusual operating conditions, such as, magnetic-field-induced strains and eddy currents, energetic particle and photon bombardment, large transient gas loads, and the use of 100 Ci quantities of tritium. In addition, novel vacuum wall surfaces and fast moving mechanical or magnetic plasma limiters will be required to minimize the influx of impurities during discharges.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.