Abstract

Integrated Project Delivery (IPD) has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants, and is therefore gaining popularity in the Architecture, Engineering and Construction (AEC) industry. For owners considering an IPD approach and are incapable or unprepared to pursue a “pure” IPD project, an IPD-ish approach could be an alternative option. IPD mode is featured by implementing a range of fundamental principles. However, investigations on application of IPD-ish principles to actual construction projects are highly limited. This research mainly focused on a Cognitive Task Analysis (CTA) of the application of IPD principles to the design and construction of an IPD-ish project, and presenting a case study on an underground campus-parking facility. A case study for CTA was designed in this study: a project progress map was developed, wherein seven project phases were defined; by analyzing the project goals and technical measures in each project phase, six key IPD elements was summarized, and a few specific work measures for addressing these elements were discussed. For owners or participants intending to plan an IPD-ish project, the results of the study provide a few references on the selection and application of IPD principles in each project phase.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call