Abstract
PT. PAI is a footware company that produces sports shoes. The production process at PT. PAI, has a waste of 15.891%. To overcome the problems that occur, this study was conducted with the aim of identifying and proposing waste elimination. The method used is a lean manufacturing approach. One of the tools used is Value Stream Mapping (VSM) and Yamazumi Chart. The first stage to solve the problem is the identification of waste using the Waste Relationship Matrix (WRM), Waste Assessment Questionnaire (WAQ) and VALSAT. The second stage is carried out by designing the current Value Stream Mapping (VSM), designing the proposed improvements using the Yamazumi Chart to balance the production line and designing the Future VSM based on the results of the proposals that have been given. The result of identification using these tools is known that the biggest waste is waste in the process with a percentage of 15.891% followed by overproduction of 15.774%. Based on the calculation using VSM and Yamazumi Chart, elimination of waste can be done as much as 5.48%, reducing the number of workers by 32 people and reducing the number of work stations by 16 work stations
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.