Abstract

When a waste generated, treated, or disposed of at a site in the United States is classified as hazardous under the Resource Conservation and Recovery Act and is destined for land disposal, the waste manager responsible for that site must select an approach to comply with land disposal restrictions (LDR) treatment standards. This paper focuses on the approach of obtaining a variance from existing, applicable LDR treatment standards. It describes the types of available variances, which include (1) determination of equivalent treatment (DET); (2) treatability variance; and (3) treatment variance for contaminated soil. The process for obtaining each type of variance is also described. Data are presented showing that historically the U.S. Environmental Protection Agency (EPA) processed DET petitions within one year of their date of submission. However, a 1999 EPA policy change added public participation to the DET petition review, which may lengthen processing time in the future. Regarding site-specific treatability variances, data are presented showing an EPA processing time of between 10 and 16 months. Only one generically applicable treatability variance has been granted, which took 30 months to process. No treatment variances for contaminated soil, which were added to the federal LDR program in 1998, are identified as having been granted.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call