Abstract
Increasing the processing capacity and lowering the operating costs of the humps are associated with improving the track filling quality of the hump yard. The track filling quality depends on the curvature of the profile. To analyze the profile deviation, it is proposed to use the concavity coefficient, which is the ratio of the cross-sectional area of the actual profile to the normative profile values. For the study, the developed simulation model of track filling of the hump yard was used, based on calculating the movement speed of the cut and taking into account the possibility of unhooking the cut after stopping, the error of the speed control devices operation of the uncoupling cut on the way and the retarder operation, the possibility of starting the train cars when the next cut collides with them. Studies have shown that the concavity coefficient can be used as a numerical criterion in assessing the deviation of the profile from the normative values. There is a dependence between the concavity coefficient and the quality indicators of the track filling. The obtained results can be used to assess the effectiveness of the track profile alignment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.